[. . . ] 5 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . [. . . ] The stand accommodates a 55-gallon drum to collect crushed and ejected cans The crusher provides the following features: · Powerful 3. 75 ton cylinder crushing plate assures the force necessary to do the job when crushing up to 7 quart cans. Lower slider plate automatically slides open at the end of the crushing cycle to eject cans into a disposal drum located under the stand. Page 4 of 8 OWNER/OPERATOR RESPONSIBILITY It is the owner/operator responsibility to properly use and maintain this equipment. The instructions and warnings contained in this manual shall be read and understood by the owner/operator prior to operating this equipment. If an owner/operator does not understand English, the contents of this manual shall be explained in the owner/ operator native language to assure the owner/operator comprehends. It is the owner/operator responsibility to maintain the legibility of all warning and Instruction labels. The owner/operator shall retain this manual for future reference to important warnings, operating and maintenance instructions. Figure 1 INSTALLATION Installation consists of attaching the stabilizer feet to the stand, the stand to the crushing chamber, and connecting an external air supply with 90 to 120 p. s. i. Bolt stabilizer feet to the crusher stand using the four 3/8-16 x 3/4 bolts & washers. Using a hoist or Hi-Lo, set the crusher chamber on the stand with the upper crossbar facing the front of the unit. Bolt crusher chamber to stand using the remaining 3/8" hardware supplied. Connect the supplied pressure regulator/filter and oiler assembly to the 3/8" valve located on the back of the crushing chamber. Remove the bowl of the oiler and fill to 3/4 full with 30W non-detergent oil, replace bowl. Drip rate should be lowered if oil is noticed leaking from the cylinder. Crusher stand 3/8" Hex bolt Oiler Filter/Regulator Stabilizer foot Page 5 of 8 INSPECTION Prior to operation a visual Inspection shall be made. Any crusher that appears to be damaged in any way, is badly worn or operates abnormally shall be removed from use until repairs are made. If over pressurizing of the equipment is believed to have occurred, contact a factory authorized service center for inspection of the crusher. An annual inspection by a factory authorized service center is recommended. [. . . ] Regularly clean the crusher chamber to remove any accumulated sludge, metal particles or any other debris that could affect the crusher operation. Apply grease to door hinges on a regular basis to prevent the door from binding. Apply motor oil to door latch pivot points on a regular basis to prevent latch from binding. [. . . ]